12.12.2017

  • LME:
  • Aluminium: 

    2085.00 USD/tonne

  • Сopper: 

    6872.50 USD/tonne

  • Zinc: 

    3271.50 USD/tonne

  • Nickel: 

    11730.00 USD/tonne

  • Lead: 

    2459.50 USD/tonne

  • Tin: 

    19415.00 USD/tonne

  • Aluminium Alloy: 

    1840.00

  • NASAAC: 

    1881.00

  • Cobalt: 

    61500.00 USD/tonne

  • Gold: 

    1292.40 USD/tonne

  • Steel Scrap: 

    330.00 USD/tonne

  • Steel Rebar: 

    534.00 USD/tonne

  • LBMA:
  • Gold: 

    1286.95 USD/oz

  • Silver: 

    16.96500 USD/oz

  • Platinum: 

    927.00 USD/oz

  • Palladium: 

    994.00 USD/oz

16.09.2015

Construction of “Abashevskaya” plant

For optimization purposes Ore Dressing Plant “Abashevskaya”, which is located in Novokuznetsk, has put into operation new Metso impact crusher. New equipment will help to decrease production losses and to reduce operational down time.

Initially “Abashevskaya” plant was designed for easy and medium-processed coal. The demand of new crushing equipment appeared at the moment, when processing of coal became more difficult – new conditions were required to open pure coal and ore particles. In cooperation with Sever Minerals new solution was found – to install impact Metso crusher, which is used for ore crushing. Ore is much harder than coal and by this reason the equipment works efficiently with hard materials.

“First testing showed us that the crusher has made its job perfectly. Another big advantage is lack of humid materials sticking to crusher – thanks to permanent rotation the crusher just throws material down,” – said Aleksey Vinogradov, Deputy Operational director of “Abashevskaya” plant.

As a result, the use of this equipment significantly saves time and decreases losses, which allows the plant to meet new performance indicators.

Back to all news